The honest answer is that it depends on one thing more than any other: whether anything moves.
Everything else is detail. Here is the realistic version, start to finish, for a Connecticut bathroom.
A same-footprint replacement: days, not weeks
If the tub, toilet, and sink stay exactly where they are and you are replacing surfaces and fixtures, this is a short project. An acrylic tub or shower system installed in the existing opening genuinely can be done in a day.
That is what a one-day bath actually is. It is not marketing. It is a specific project type with a specific limit, and the limit is that nothing can move and nothing behind the wall can be wrong.
A tub-to-shower conversion: usually several days
Removing a tub and putting in a shower adds real steps. The tub comes out, the opening usually needs reframing, the drain often needs to be adjusted, and then the base and walls go in.
None of that is exotic, but it is sequential. You cannot waterproof before the framing is right, and you cannot set the base before the drain is correct.
A full remodel with plumbing changes: weeks
The moment a fixture moves, you are into plumbing, and in a lot of Connecticut homes that means opening a floor. Add an inspection if a permit is involved, and add cure and set times for anything tiled.
Tile is the quiet schedule killer. Not because it takes long to install, but because mortar and grout have to cure on their own schedule and no amount of scheduling pressure changes chemistry.
What actually causes delays
What is behind the wall. This is the big one. In a house built before roughly 1980 with an original tub surround, there is a decent chance of water damage in the framing or the subfloor. Nobody can see it before demolition. Finding it is not bad workmanship. Missing it is.
Material lead times. Standard acrylic systems are usually available. Custom glass is measured after the walls are set, not before, and then it has to be fabricated. If you want a frameless enclosure, build that into your expectations.
Decisions. The most common delay we see is not the crew. It is waiting on a homeowner to pick a tile or approve a change. A project can sit still for a week over a decision that takes ten minutes.
Permits and inspections. These vary by town in Connecticut and they are worth asking about up front. A contractor who has worked in your town knows the building department's actual pace.
How to make it go faster
Make your selections before demolition starts, not during
Decide early whether anything is moving, because that is the fork in the whole schedule
Ask what happens if there is damage behind the wall, and get the answer before day one
Do not schedule the project against a hard deadline like a holiday or houseguests
A word about the one-bathroom house
If it is your only bathroom, the timeline stops being a scheduling question and starts being a living question. Ask specifically how many days the room will be unusable, not how many days the project takes. Those are different numbers and only one of them affects your week.
A good contractor will tell you that number without being asked.
Getting a real timeline for your bathroom
Like cost, the timeline is not answerable from a website. It is answerable in about twenty minutes standing in the room, once someone can see the layout, the age of the house, and what you actually want changed.
Related reading: what a bathroom remodel actually costs in Connecticut.
Imagine Remodel is based in Cromwell and works throughout central Connecticut, including Manchester, Glastonbury, Middletown, and Rocky Hill.
Book a free in-home estimate and get a schedule you can plan your week around.